Broadway Avenue Construction

broadwayRoadClosuresSummerAs most will know by know, Broadway roads and sewer/water lines are getting a face-lift this summer.  Construction will start on May 2 and is expected to be finished by the end of September.

The construction will be done block by block to keep Broadway as accessible as possible. Pedestrians should have to Broadway throughout the whole process.  The City is trying to minimize the impact to Broadway merchants.

For more information you can check out the City’s information pages http://saskatoon.ca/broadway